Factory Acceptance

Contract Execution Phase Milestone 3 - Contract Order Validation Sizing Data Certificate Manufacturing Factory Acceptance Test Factory Acceptance Shipment Site Opening Off-Site Activities

The “Factory Acceptance Test” is an optional phase starting at the end of the manufacturing phase. It intends to jointly verify, between Customer and Supplier, the respect of the design data as defined in the “contract” and/or in the “Sizing Data Report”

The verification, if specified in the contract, will be documented by a “Factory Acceptance Test Report”.

The equipment will be dismantled and prepared for shipment after the Manufacturing phase or when the “Factory Acceptance Test Report” is signed by the Customer, when applicable.

ABMI Standard Factory Acceptance Test Certificate Protocole